Project Reference

OSRAM OPTO PROJECT (T.T.E ENGINEERING)

  • Hook up grinding NSG 1150V process utility piping.
  • Install general Exhaust PP Piping for 7FLLO Machine.
  • Install vacuum, PCW & exhaust Piping for 7FPAL7 Machine.

HOYA PROJECT (T.T.E NGINEERING)

  • Hook up utility for NH40H
  • Install PVC sch80 waste piping from PS3 room to WWTP

FUJI PROJECT (T.T.E ENGINEERING )

  • To dismantle and reinstall utility for polishing pat B Dip Machine.

IBIDEN PROJECT (T.T.E ENGINEERING)

  • Install and modify eye wash basin, eye shower, drain pan and drain piping for secondary base on Building 1.
  • Install drain pan to cover al chemical piping and lead sensor piping.
  • To install WWTP and DI Piping at IBIDEN phase 2.

WESTERN DIGITAL (WD) PROJECT (T.T.E ENGINEERING)

  • To install PVC Exhaust ,Set up utilities for FTP Machine.
  • To install ring blower high static exhaust piping at MA7.

B BRAUN PROJECT (T.T.E ENGINERING)

  • To install process drain, chemical drain, normal drain, scupper drain, normal storm drain & cyclone drain pipe.

TOYO MEMORY PROJECT (T.T.E ENGINEERING)

  • To install Exhaust Piping.

INCHIKOH PROJECT (T.T.E ENGINEERING)

  • To install raw water PVC main Piping and clean room.

SEM PROJECT (T.T.E ENGINEERING)

  • To install DI water piping .

INFINEON TECHNOLOGY (Kulim Hitech)

  • To modify CSULF drain Piping.
  • To install new CSULF drain piping at support B L3 to L2 Fab Core.

KURITA WATER INDUSTRIES

  • To install Filter Press Piping and WWTP piping.
  • To install new CSULF drain piping at support B L3 to L2 Fab Core

KURITA WATER (M)

  • To install KMN 04 Piping at linkway.
  • To install 33% HCL Pump header piping.

TS SOLAR PROJECT (INTELLIGENT TECHNOLOGY SERVICES)

  • To install cold D.I and waste Water piping.
  • Replacement of Domestic Water Piping for B108 and B109 1ST Floor System.

SILTERRA

  • To install UPW new stick for tool PITRTE O5.
  • To hook-up PCW S/R for tool PITRTE 09.

ATOTECH (JAPAN)

  • Supply PVC drain tank and parts for IEM2 project.
  • PLB Line Installation Line 1,2,3,4 & 5.
  • CU24 Line Installation Line 1,2,3,4,5,6,7 & 8.

MITSUI COPPER FOIL PROJECT (MESCOENG )

  • Supply PVC tanks and Parts for TR.203 and TR.205.
  • To install and modify PVC piping to TR.101,TR.104, TR.108, TR.201, TR.203 and TR.205.

TOKUYAMA PROJECT – (MESCOENG)

  • Supply PVC tanks and Parts .

DESMET BALESTRA

  • Supply PVDF + FRP Vessel Tank and parts.

HENG LEE COMPOSITE

  • Supply PE NATURAL Vessel tanks and parts.
  • Supply PE BLACK Vessel Tanks and parts.